You are managing an automated linear processing pipeline consisting of $n$ distinct, ordered phases (indexed $0$ through $n-1$). A single worker handles jobs sequentially through these phases. The worker must completely finish all required items in phase $i$ before starting any work on phase $i + 1$.
You are provided two integer arrays of length $n$:
item_counts[i]: the number of units to process in phase $i$.unit_times[i]: the execution time needed for a single unit in phase $i$.
You are also given an integer max_time representing the maximum time units available to the worker. A unit of work is considered complete if and only if its full duration finishes at or before max_time. If the time limit is reached while a unit is still being processed, that unit is not counted as completed, and the worker halts instantly.
Return the total count of fully finished units across all phases within max_time.
Constraints
- $n == \text{len}(item_counts) == \text{len}(unit_times)$
- $1 \le n \le 10^5$
- $0 \le item_counts[i] \le 10^9$
- $0 \le unit_times[i] \le 10^9$
- $0 \le max_time \le 10^{18}$
Examples
Example 1
Input: count_completed_units([3, 2, 5], [4, 10, 2], 25)
Output: 4
Example 2
Input: count_completed_units([0, 4, 2], [5, 0, 3], 4)
Output: 5
Hints
Hint 1
Simulating each job one by one will be too slow because item counts can be up to 10^9 per phase.
Hint 2
Instead of individual units, use integer division to determine how many units of the current phase can finish in the remaining time.
Hint 3
Be careful with zero unit times (to avoid division by zero) and zero item counts, and remember to halt as soon as a non-empty phase cannot be fully finished.
Worked solution
Medium Try it yourself first — then compare your approach, complexity and edge cases.
Approach
Because the pipeline is strictly sequential and all units in a given phase have the same processing time, we can evaluate each phase in $O(1)$ time rather than iterating unit by unit.
For each phase:
- Zero-item phases (
count == 0): Skip immediately; no time is spent. - Zero-duration phases (
duration == 0): Allcountunits complete instantly without consuming any remaining time. Handling this early also avoids division-by-zero errors. - Standard phases (
duration > 0):- Calculate how many whole units fit into the available time:
done = min(count, remaining // duration). - Increment the finished unit count by
doneand reduceremainingbydone * duration. - If
done < count, the worker was unable to complete the current phase. Since phases must be done in strict sequence, the worker stops immediately and no subsequent phases can be started.
- Calculate how many whole units fit into the available time:
Complexity Analysis
- Time Complexity: $\mathcal{O}(n)$, where $n$ is the number of pipeline phases. We process each phase at most once with fixed mathematical operations.
- Space Complexity: $\mathcal{O}(1)$ auxiliary space as we only store a few running total counters.
Python Reference Solution
from typing import List
def count_completed_units(item_counts: List[int], unit_times: List[int], max_time: int) -> int:
remaining = max_time
total_completed = 0
for count, duration in zip(item_counts, unit_times):
if count == 0:
continue
if duration == 0:
total_completed += count
continue
done = min(count, remaining // duration)
total_completed += done
remaining -= done * duration
if done < count:
break