practice a little every day — you've got this ♡
Greedy & Intervals Interview Problems
Practice 5971 original coding, SQL, system design, machine learning and behavioral problems across 15 topics. Coding and SQL problems run against hidden test cases right in your browser; every problem has hints and a worked solution, free.
- 5971
- Problems
- 2211
- Auto-graded
- 15
- Topics
- 272
- Added today
Showing 61–90 of 161 results
- Greedy & IntervalsMediumAuto-gradedCompute Free Windows from Schedule Constraints
Compute unreserved time windows for specified daily schedules given opening hours and existing bookings.
Greedy & Intervalsintervalssortingstringgreedy - Greedy & IntervalsMediumAuto-gradedResolve Overlapping Text Edit Spans by Priority
Sweep over span boundaries with a heap to resolve overlapping inclusive edit spans using priority, original length, and input order, splitting losers into fragments.
Greedy & Intervalsintervalssweep-lineheaptie-breaking - Greedy & IntervalsMediumAuto-gradedConsolidate Overlapping Bookings in a Weekly Schedule
Parse weekday and 24-hour time strings, then merge touching or overlapping same-day bookings and output them in a canonical, sorted string format.
Greedy & Intervalsintervalssortingstring-parsingmerge-intervals - Greedy & IntervalsMediumAuto-gradedSubscription Windows: Purchase Attribution and Anomaly Report
Merge each user's subscription intervals, then attribute purchases to the merged windows, count September active days, and report out-of-window and overlap anomalies.
Greedy & Intervalsintervalsmerge-intervalshash-mapdatetime - Greedy & IntervalsEasyAuto-gradedMaximum Affordable Items Within Budget
Determine the maximum collection of items that can be purchased given individual item costs and a total spending limit.
Greedy & Intervalsgreedysortingarrays - Greedy & IntervalsEasyAuto-gradedFind Peak Event Density in Fixed Duration Window
Determine the maximum number of recorded logs occurring within a contiguous time interval using a sliding window approach.
Greedy & Intervalssliding-windowtwo-pointersarraysintervals - Greedy & IntervalsMediumAuto-gradedWeekly Deploy Windows with Time Zones and Blackouts
Convert weekly recurring allow and freeze windows from local time zones to UTC, subtract the freezes, and list the first usable slots after a notice period.
Greedy & Intervalsintervalssweep-linetime-zonesmodular-arithmetic - Greedy & IntervalsMediumAuto-gradedMetered Usage Bill with Special Rate Windows
Compute a total bill over a half-open time window where disjoint special-rate windows replace the default hourly rate, testing interval clipping and boundary handling.
Greedy & Intervalsintervalssweepmatharrays - Greedy & IntervalsMediumAuto-gradedAnalyze Schedule Capacity and Overlaps
Evaluate interval concurrency to determine if single-resource scheduling is possible and calculate peak concurrent demand.
Greedy & Intervalsintervalssortingheapsweep-line - Greedy & IntervalsMediumAuto-gradedInsert and Merge Interval into Sorted Collection
Incorporate a target range into an already sorted list of disjoint closed intervals, merging any overlapping or adjacent spans in linear time.
Greedy & Intervalsintervalsarraysgreedy - Greedy & IntervalsMediumAuto-gradedFind the Maximum Size Connected Interval Component
Find the maximum number of intervals that belong to a single connected component where edges represent inclusive interval overlaps.
Greedy & Intervalsintervalssortinggreedygraphs - Greedy & IntervalsEasyAuto-gradedSplit Chores Between Two Workers With a Fixed Quota
Choose exactly k items for the first worker to maximize total payoff, which tests reducing a problem to per-item differences and greedy top-k selection.
Greedy & Intervalsgreedysortingarraysexchange-argument - Greedy & IntervalsMediumAuto-gradedEarliest Shared Free Slot Across Several Schedules
Find the earliest meeting slot of a given length that fits inside everyone's availability window and avoids every busy block, by intersecting windows and merging busy intervals.
Greedy & Intervalsintervalssweep-linesortingscheduling - Greedy & IntervalsMediumAuto-gradedMerge Event Windows Within Each Locality
Join two record lists by id, group event time ranges by locality, merge overlapping or touching ranges, and return the merged windows in a specified sort order.
Greedy & Intervalsintervalsmerge-intervalshash-mapsorting - Greedy & IntervalsMediumAuto-gradedMinimum Removals for Conflict-Free Time Slots
Tests the greedy earliest-finish strategy: find the fewest ranges to discard so the rest share no interior points, with touching endpoints allowed.
Greedy & Intervalsgreedyintervalssortinginterval-scheduling - Greedy & IntervalsMediumAuto-gradedFewest Vehicles to Cover Back-to-Back Bookings
Find the peak number of simultaneously active half-open intervals using a sweep line or heap, with correct handling of ties where one booking ends as another begins.
Greedy & Intervalsintervalssweep-linesortingheap - Greedy & IntervalsMediumAuto-gradedSequential Allow/Deny Rules Over an IPv4 Block
Track an IPv4 block as disjoint integer intervals while applying ordered allow and deny CIDR rules, deciding whether the block ends up fully covered with no deny hit.
Greedy & Intervalsintervalsipv4cidrsimulation - Greedy & IntervalsMediumAuto-gradedCourier Earnings from Overlapping Order Events
Sweep over unsorted start/end events to total concurrency-weighted seconds, validate malformed input, and convert to a half-up rounded dollar string.
Greedy & Intervalsinterval sweepevent sortingvalidationexact arithmetic - Greedy & IntervalsMediumAuto-gradedEmptying Depots With a Limited Pool of Partner Skips
Compute the minimum skips each depot needs using modular arithmetic, then greedily pick the cheapest depots under a shared skip budget to maximize emptied depots.
Greedy & Intervalsgreedymathsortingmodular-arithmetic - Greedy & IntervalsEasyAuto-gradedBest Single Buy-Sell Gain from Daily Quotes
Find the largest gain from buying on one day and selling on a later day in a list of daily prices, returning 0 if no gain is possible.
Greedy & Intervalsgreedyarraysrunning-minimumsingle-pass - Greedy & IntervalsMediumAuto-gradedFewest Conference Rooms for a Day of Bookings
Compute the minimum number of rooms needed to host all time-range bookings when back-to-back bookings may reuse a room, testing sweep-line or heap-based interval reasoning.
Greedy & Intervalsintervalsheapsweep-linesorting - Greedy & IntervalsMediumAuto-gradedFewest Drivers to Cover Every Trip Without Overlap
Find the fewest drivers needed to serve all trips given [start, end) times, which reduces to the peak number of simultaneous trips and tests sweep-line or heap handling of boundaries.
Greedy & Intervalsintervalssweep-lineheapgreedy - Greedy & IntervalsMediumAuto-gradedFind the First Free Slot After Busy Minutes in Text Schedules
Parse text schedule entries into inclusive minute intervals, merge them, and find the earliest k-minute free slot that follows the first busy minute of the day.
Greedy & Intervalsintervalsmerge-intervalsstring-parsingsorting - Greedy & IntervalsMediumAuto-gradedStock Piles Priced by Remaining Count: Maximum Earnings
Greedy selling from the largest pile, solved in bulk with sorting and arithmetic-series sums because the number of sales is too large to simulate one by one.
Greedy & Intervalsgreedysortingarithmetic-seriesmath - Greedy & IntervalsMediumAuto-gradedCollapse Overlapping Time Ranges Into Disjoint Blocks
Sort closed integer ranges and sweep once to combine any that overlap or touch, returning the minimal ordered list of disjoint ranges.
Greedy & Intervalsintervalssortingsweepgreedy - Greedy & IntervalsMediumAuto-gradedPeak Concurrent Shifts Across Half-Open Time Ranges
Find the largest number of half-open time ranges that overlap at one instant, handling shared endpoints, empty ranges and large inputs with a sweep over sorted boundaries.
Greedy & Intervalssweep-lineintervalssortinghash-map - Greedy & IntervalsMediumAuto-gradedCourier Earnings from Overlapping Order Timelines
Sweep over unsorted accept/fulfill events to total a courier's earnings, where pay per minute scales with the number of simultaneously open orders.
Greedy & Intervalssweep-linesortingintervalssimulation - Greedy & IntervalsMediumAuto-gradedBooked Time and Peak Room Demand for a Schedule
Compute the total time covered by a set of half-open intervals and the maximum number of simultaneously active intervals, ignoring empty or reversed ones.
Greedy & Intervalsintervalssweep-linesortingmerge-intervals - Greedy & IntervalsMediumAuto-gradedPick One Day Per Workshop Within Its Availability Window
Choose a distinct day for as many workshops as possible, each within its own window, using an earliest-deadline-first greedy with a min-heap.
Greedy & Intervalsgreedyheapintervalssorting - Greedy & IntervalsMediumAuto-gradedDaily Flat-Fee Cap on Overlapping Job Charges
Sum per-day min(active cost, flat fee) over huge day ranges using an event sweep, with the result taken modulo 1,000,000,007.
Greedy & Intervalsline-sweepintervalsdifference-arraymodular-arithmetic