KatInterview

practice a little every day — you've got this ♡

Greedy & Intervals Interview Problems

Practice 5969 original coding, SQL, system design, machine learning and behavioral problems across 15 topics. Coding and SQL problems run against hidden test cases right in your browser; every problem has hints and a worked solution, free.

5969
Problems
2211
Auto-graded
15
Topics
272
Added today

Showing 151–161 of 161 results

  • Greedy & IntervalsHardAuto-graded
    Minimum Guards to Cover All Museum Gallery Segments

    Tests ability to apply a sweep-line with a greedy exchange argument to optimally place point guards that each cover a fixed-radius interval on a 1-D gallery.

    Greedy & Intervalsgreedyintervalssweep line
  • Greedy & IntervalsMediumAuto-graded
    Assign Tasks to Time Slots with Minimum Idle Penalty

    Tests the exchange-argument greedy technique by scheduling deadline-bearing tasks into time slots to minimize total weighted idle (missed-deadline) penalty.

    Greedy & Intervalsgreedyintervalsschedulingexchange argument
  • Greedy & IntervalsMediumAuto-graded
    Maximize Completed Jobs with Deadlines

    Tests greedy scheduling with deadlines: select and order unit-length jobs to maximize total profit, applying an exchange argument to prove optimality.

    Greedy & Intervalsgreedyschedulingsorting
  • Greedy & IntervalsMediumAuto-graded
    Maximum Simultaneous Room Bookings

    Tests the sweep line technique on interval scheduling to find the peak number of overlapping room bookings over a timeline.

    Greedy & Intervalssweep lineintervalsgreedy
  • Greedy & IntervalsMediumAuto-graded
    Minimize Maximum Job Lateness with Deadlines

    Tests the classic exchange-argument greedy insight: scheduling jobs by earliest deadline minimizes the maximum lateness over all jobs.

    Greedy & Intervalsgreedyintervalssortingexchange-argument
  • Greedy & IntervalsMediumAuto-graded
    Minimum Penalty Class Schedule with Fixed Breaks

    Tests whether a candidate can apply an exchange-argument greedy to order tasks with deadlines and penalties to minimize total weighted lateness, with fixed unavailable time windows.

    Greedy & Intervalsgreedyintervalsschedulingexchange argument
  • Greedy & IntervalsHardAuto-graded
    Minimum Penalty Task Schedule with Deadlines

    Tests the classic exchange-argument greedy insight that scheduling jobs by deadline minimizes total weighted lateness on a single machine.

    Greedy & Intervalsgreedyintervalsschedulingexchange-argument
  • Greedy & IntervalsMediumAuto-graded
    Maximum Coverage From Non-Overlapping Intervals

    Tests ability to merge overlapping intervals and use a greedy sweep to find the maximum total length covered by selecting at most K non-overlapping merged segments.

    Greedy & Intervalsgreedyintervalssorting
  • Greedy & IntervalsMediumAuto-graded
    Minimum Breaks to Cover All Shifts with Rest Windows

    Tests whether a candidate can apply an exchange-argument greedy to schedule the fewest rest-window insertions so every worker shift is covered without violating a maximum continuous-work limit.

    Greedy & Intervalsgreedyintervalsschedulingexchange argument
  • Greedy & IntervalsEasyAuto-graded
    Count Peak Hours Across Venue Time Slots

    Tests the ability to use a sweep line (difference array) to efficiently count how many time slots are simultaneously "active" and find the maximum overlap count.

    Greedy & Intervalsgreedyintervalssweep line
  • Greedy & IntervalsEasyAuto-graded
    Maximize Jobs Completed Before Their Deadlines

    Tests greedy scheduling with deadlines: select and order unit-duration jobs to maximize the count of jobs finished on or before their individual deadlines.

    Greedy & Intervalsgreedyintervalssorting